Play Pensacola(tm) Parks and Recreation

Miscellaneous Improvements

Last Updated: 8/26/2010

New Playground Equipment 

Look for new playground equipment to be installed by the end of September in the following parks.

 Alabama Square    Zamora Square(Installed)     Dunmire Woods(Installed)     Springdale Park(Installed)     Lavallet Park(Installed)     Fricker Community Center

Hitzman Park

In addition to the construction of an ADA accessible restroom, the park will receive several more picnic shelters with picnic tables and the existing large covered picnic shelter will be repaired.

Bayview Senior Citizen

The City's Senior Citizen Center will receive a much need refurbishment.  The kitchen will be upgraded along with the restrooms.  An automatic opening entry door will be installed and a number of the buildings door and window frames will be replaced due to deterioration.

  • The ballroom has received new wood flooring and new paint
  • Interior of the building has been painted
  • A pergola has been installed along with an out side seating area

Lavallet Park 

The new playground has been installed and more play equipment has been ordered.   The park walkway has been repaired and extended around the perimeter of the park.  The park picnic shelter has also been installed and will be open for use shortly. 

Morris Court 

New play equipment, repair of basketball court lighting and possible walking path around the park.

 

If you have any questions on any of the planned improvements listed, please contact the City of Pensacola Parks and Recreation Department at (850) 436-5679.